The initial project at the Fort Rucker Combat Readiness Center involved the installation of a new Caterpillar 250kW Diesel Powered Standby Power Generator unit and four (4) APC In-Row Cooling units installed in the data center. The project scope was amended during the project to include a brick walled equipment courtyard, new handicap accessible ramp w/aluminum awning, replacement of the building wide fire alarm system and the installation of two (2) new FM200 fire suppression systems in storage vaults in the basement of the building. The mechanical and electrical aspects of the project were completed without disruptions to the existing data center operations. The new equipment courtyard provided space allowances for future equipment upgrades at the facility.
Project Time: 6 Months